2018 general planning

The planning of 2018 can be divided in 2 separate parts:
  • Development and integration of DFPCs/DFN
  • Experimental evaluation

Development and integration of DFPCs/DFN

This part contains the production of all the desired functions inside inFuse: SLAM, localization, DEM building, Visual odometry, etc... It is separated into three phases:
  • C/C++ coding of the different libraries (middleware agnostic)
  • Integration: it will be provided at two different levels:
    • InFuse architecture level which is the final product of the project
    • Genom3 integration to be tested and evaluated on LAAS rover
    • Support functions: logging, replay and displaying of the different data produced
    • Non-InFuse "add-ons": in order to test and evaluate the algorithms, LAAS intends to add loop-closure in the robotics loop, i.e. to provide an autonomous navigation module

Experimental evaluation

The experimental evaluation is split into three big tracks: DLR-BB2, DFKI-Sherpa, and M3 (Mission Mana and Minnie in Morocco).

DLR-BB2

This evaluation will be performed at DLR on the BB2 robot in a testing field where an almost perfect ground truth already exists. It is destined to test the quality of different DFNs (some of which will be provided by the LAAS). It does not use the InFuse architecture.

DFKI-Sherpa

This evaluation will happen in Morocco and is destined to test the InFuse architecture. The scenarios of this track are yet to be defined.

M3

This mission will be led by LAAS and covers more than just the Morocco travel. It aims at:
  • Building a database from all the sensors with which the rovers will be equipped.
  • Test and evaluate the different algorithm with and autonomous navigation stack
  • Test and evaluate the multi-robot perception provided in InFuse
It will be pursued in 3 big phases:
  • Simulation: the rovers will be simulated thanks to MORSE: https://www.openrobots.org/wiki/morse
  • A test campaign will happen at CNES during the spring of 2018
  • A final test campaign will take place at the end of 2018/beginning of 2019.

Updated by Quentin Labourey over 6 years ago · 3 revisions