Project

General

Profile

Actions

CNES-SEROM » History » Revision 6

« Previous | Revision 6/9 (diff) | Next »
Quentin Labourey, 2018-02-20 10:54


CNES-SEROM

Administrative matters

  • Get entrance permits for Ellon and Andrea: Michel Delpech will check the necessary documents. It should cause no problem whatsoever
  • Make sure we can use our wifi infrastructure: Yes, Michel will check if authorizations are necessary but should be OK
  • [Ellon adds: ] Ask if we would be given access to Internet: Yes, eduroam is available on site

Visit of Feb. the 20th

  • Things to check:
    • Areas where the rovers can evolve: See pictures below
    • Place to store the robots: Robots will be stored in a small room near the field, during our whole experimental campaign.
    • Place to mount the GPS base (not to re-install it every day): Yes, probably right near the SEROM field
    • [Ellon adds: ] Assess the quantity of "structure" in the terrain (more identifiable rocks, terrain relief, etc): Lots of rocks (see pictures below), might be difficult to autonomously navigate the field, and we might move rocks around
    • [Ellon adds: ] Take pictures (if possible) to show to Ellon and Andrea: See pictures below
  • Questions raised by the visit
  • Disponibility of the ground truth: Yes, but not extremely precise. We cannot make our drone fly to make our own ground truth (procedure to heavy). Anyway we might not need a precise ground truth as the quality of the DEM is not the main thing we are going to evaluate, and it is linked to the quality of localization **

Updated by Quentin Labourey almost 7 years ago · 9 revisions