CNES-SEROM » History » Revision 6

Revision 5 (Ellon Paiva Mendes, 2018-02-19 15:09) → Revision 6/9 (Quentin Labourey, 2018-02-20 10:54)

h1. CNES-SEROM 

 h2. Administrative matters 

 * Get entrance permits for Ellon and Andrea: *Michel Delpech will check the necessary documents. It should cause no problem whatsoever* Andrea 
 * Make sure we can use our wifi infrastructure: *Yes*, Michel will check if authorizations are necessary but should be OK infrastructure 
 * [Ellon adds: ] Ask if we would be given access to Internet: *Yes*, eduroam is available on site Internet 

 h2. Visit of Feb. the 20th 

 * Things to check: 
 ** Areas where the rovers can evolve: *See pictures below* evolve 
 ** Place to store the robots: *Robots will be stored in a small room near the field*, during our whole experimental campaign. robots 
 ** Place to mount the GPS base (not to re-install it every day): *Yes*, probably right near the SEROM field day) 
 ** [Ellon adds: ] Assess the quantity of "structure" in the terrain (more identifiable rocks, terrain relief, etc): *Lots of rocks (see pictures below)*, might be difficult to autonomously navigate the field, and we might move rocks around etc) 
 ** [Ellon adds: ] Take pictures (if possible) to show to Ellon and Andrea: *See pictures below* Andrea 

 * Questions raised by the visit 

 ** Disponibility of the ground truth: *Yes, but not extremely precise.* We cannot make our drone fly to make our own ground truth (procedure to heavy). Anyway we might not need a precise ground truth as the quality of the DEM is not the main thing we are going to evaluate, and it is linked to the quality of localization 
 **