CNES-SEROM » History » Version 6
Quentin Labourey, 2018-02-20 10:54
1 | 1 | Simon Lacroix | h1. CNES-SEROM |
---|---|---|---|
2 | |||
3 | h2. Administrative matters |
||
4 | |||
5 | 6 | Quentin Labourey | * Get entrance permits for Ellon and Andrea: *Michel Delpech will check the necessary documents. It should cause no problem whatsoever* |
6 | * Make sure we can use our wifi infrastructure: *Yes*, Michel will check if authorizations are necessary but should be OK |
||
7 | * [Ellon adds: ] Ask if we would be given access to Internet: *Yes*, eduroam is available on site |
||
8 | 1 | Simon Lacroix | |
9 | h2. Visit of Feb. the 20th |
||
10 | 2 | Simon Lacroix | |
11 | 1 | Simon Lacroix | * Things to check: |
12 | 6 | Quentin Labourey | ** Areas where the rovers can evolve: *See pictures below* |
13 | ** Place to store the robots: *Robots will be stored in a small room near the field*, during our whole experimental campaign. |
||
14 | ** Place to mount the GPS base (not to re-install it every day): *Yes*, probably right near the SEROM field |
||
15 | ** [Ellon adds: ] Assess the quantity of "structure" in the terrain (more identifiable rocks, terrain relief, etc): *Lots of rocks (see pictures below)*, might be difficult to autonomously navigate the field, and we might move rocks around |
||
16 | ** [Ellon adds: ] Take pictures (if possible) to show to Ellon and Andrea: *See pictures below* |
||
17 | 2 | Simon Lacroix | |
18 | 4 | Ellon Paiva Mendes | * Questions raised by the visit |
19 | 6 | Quentin Labourey | |
20 | ** Disponibility of the ground truth: *Yes, but not extremely precise.* We cannot make our drone fly to make our own ground truth (procedure to heavy). Anyway we might not need a precise ground truth as the quality of the DEM is not the main thing we are going to evaluate, and it is linked to the quality of localization |
||
21 | ** |